Muhammad Arshad
Instrument&ControlMore than 20 Years of Experience related to various types of instruments and Process Control, heavy duty gas turbine maintenance, petrochemicals & power plants. Have very good experience in maintenance, commissioning & project, also have experience working in safety culture. Perform preventive & corrective maintenance by completing it in time without any rework. Ensure all maintenance activities are completing as per company procedure & standards. Maintaining minimum spare parts in hand and also maintaining it in the SAP system by creating new material code if required.
Gives support to my colleagues whenever it is needed & completes work coordinating with the operation and concerned departments. Excellent computer application skills, SAP Experience, excellent problem solving and leadership skills, excellent verbal and written communication skills. Coordination with planning section for daily job scheduling & weekly planning meeting.
I am an authorized permit receiver of PTWC and have a thorough awareness regarding risk assessment and PTWC procedure.
Last Resume Update | February 24, 2024 |
Address | Yanbu, Saudi Arabia |
Locked | |
Phone Number | Locked |
Experience
I & C Foreman Maintenance
Currently Working in MARAFIQ Yanbu-II power generation as I & C Foreman Maintenance from April 13, 2014 to till date, at steam turbines, boiler and common utility areas.
Power Plant having a capacity of 275X3 MW, I coordinate & execute all the daily PM& CM activities according to the plan also completes every emergency work given to its priority.
As a foreman, I describe the jobs to my team (technicians) having given importance to safety and instruction and task sheet.
I have been attended the walk down and have also raised punch lists since the commissioning & Performance test of MARAFIQ power plant, Yanbu II.
Attend annual major shutdown of 275MW Yanbu II power plant 2023.
Maintenance & Troubleshooting activities DOOSAN Steam Turbine & Generator (275 MW)
Good experience in carrying out the annual shutdown or major equipment turnarounds in the Plant. Having good hand on experience BTLD system & Teledyne hydrogen generator.
I & C Foreman Maintenance
Currently Working in MARAFIQ Yanbu-II power generation as I & C Foreman Maintenance from April 13, 2014 to till date, at steam turbines, boiler and common utility areas.
Power Plant having a capacity of 275X3 MW, I coordinate & execute all the daily PM& CM activities according to the plan also completes every emergency work given to its priority.
As a foreman, I describe the jobs to my team (technicians) having given importance to safety and instruction and task sheet.
I have been attended the walk down and have also raised punch lists since the commissioning & Performance test of MARAFIQ power plant, Yanbu II.
Attend annual major shutdown of 275MW Yanbu II power plant 2023.
Maintenance & Troubleshooting activities DOOSAN Steam Turbine & Generator (275 MW)
Good experience in carrying out the annual shutdown or major equipment turnarounds in the Plant. Having good hand on experience BTLD system & Teledyne hydrogen generator.
I&C Supervisor
Installation, Calibration, Loop testing, Commissioning & Pre-commissioning and start up activity of Steam Turbine, water treatment plant, wastewater & Heat Recovery Steam Generator (HRSG), Instrumentation. Installation Commissioning, Operation and Maintenance of Boiler Turbine & DCS of YOKOGAWA Centum CS3000VP and related Auxiliaries of WHRP (I&C). Calibration of instruments. I coordinate & execute all the daily PM& CM activities according to the plan also completes every emergency work given to its priority. Development and implementation of preventive maintenance plans for all instrumentation equipment to ensure operational effectiveness.
I&C Supervisor
Installation, Calibration, Loop testing, Commissioning & Pre-commissioning and start up activity of Steam Turbine, water treatment plant, wastewater & Heat Recovery Steam Generator (HRSG), Instrumentation. Installation Commissioning, Operation and Maintenance of Boiler Turbine & DCS of YOKOGAWA Centum CS3000VP and related Auxiliaries of WHRP (I&C). Calibration of instruments. I coordinate & execute all the daily PM& CM activities according to the plan also completes every emergency work given to its priority. Development and implementation of preventive maintenance plans for all instrumentation equipment to ensure operational effectiveness.
Instrument Lead man
Handled Installation, Calibration, Loop testing, Commissioning & Pre-commissioning and start up activities of Gas Turbine, Steam Turbine, water treatment plant, waste water, Heat Recovery Steam Generator (HRSG), Gas Pressure Reducing System (GPRS) Instrumentation.
Instrument Lead man
Handled Installation, Calibration, Loop testing, Commissioning & Pre-commissioning and start up activities of Gas Turbine, Steam Turbine, water treatment plant, waste water, Heat Recovery Steam Generator (HRSG), Gas Pressure Reducing System (GPRS) Instrumentation.
Instrument Technician
Handled Installation, Calibration, Loop testing, Commissioning & Pre-commissioning and start up activities of Gas Turbine, Steam Turbine, water treatment plant, wastewater, Heat Recovery Steam Generator (HRSG), Gas Pressure Reducing System (GPRS) Instrumentation.
Instrument Technician
Handled Installation, Calibration, Loop testing, Commissioning & Pre-commissioning and start up activities of Gas Turbine, Steam Turbine, water treatment plant, wastewater, Heat Recovery Steam Generator (HRSG), Gas Pressure Reducing System (GPRS) Instrumentation.
Instrument Technician
Attend annual major shutdown of 365MW Lal Per and 362MW Pak Gen power plants
Routine maintenance and troubleshooting of DCS, PLCs & Instruments.
Startup and Sequence Troubleshooting, repair and calibrate maintenance.
Having good experience in Boiler and Turbine startup activities, like troubleshooting, operation support etc.
Having good experience in Burner related instruments.
I coordinate & execute all the daily PM& CM activities according to the plan also completes every emergency work given to its priority.
Good experience in carrying out the annual shutdown or major equipment turnarounds in the Plant.
Instrument Technician
Attend annual major shutdown of 365MW Lal Per and 362MW Pak Gen power plants
Routine maintenance and troubleshooting of DCS, PLCs & Instruments.
Startup and Sequence Troubleshooting, repair and calibrate maintenance.
Having good experience in Boiler and Turbine startup activities, like troubleshooting, operation support etc.
Having good experience in Burner related instruments.
I coordinate & execute all the daily PM& CM activities according to the plan also completes every emergency work given to its priority.
Good experience in carrying out the annual shutdown or major equipment turnarounds in the Plant.
Education
B. Tech (Electronics)
DAE (Diploma)